Automate payment to entitlement
Correlate verified M-Pesa transactions with subscriber accounts, handle duplicate callbacks, and keep a recoverable record of the intended network change.
Bring subscriber management, access networks, and payments together. We help regional ISPs turn network operations into reliable, repeatable workflows.
For regional ISPs and network operators that need consistent subscriber access, traceable mobile-money billing, and fewer manual provisioning steps.
Correlate verified M-Pesa transactions with subscriber accounts, handle duplicate callbacks, and keep a recoverable record of the intended network change.
Connect plans and subscriber states to PPPoE or Hotspot provisioning through supported RouterOS interfaces. Define what happens when a router is temporarily unavailable.
Review OLT models, software versions, topology, and the operator’s change process. Configuration work needs a clear rollback and handover plan.
These are planning areas, not a fixed package. Integrations, migrations, third-party costs, and support commitments are defined in the proposal.
Compare engagement models ↗We agree the minimum management access needed for the work, the permitted change window, and how credentials will be shared securely. Do not send router passwords through the inquiry form.
Provider onboarding and application approvals are external dependencies. The engagement must identify who owns the Daraja application, credentials, callbacks, and required approvals.
Availability targets require an architecture, deployment topology, support model, and evidence. We do not treat a billing integration alone as an availability guarantee.
Map your users, constraints, integrations, and definition of success.
Agree the architecture, scope, delivery milestones, and acceptance criteria.
Deliver in reviewable increments with tests and regular demonstrations.
Deploy, document, and hand over the system with a practical support plan.
An ISP workflow crosses financial confirmation, application state, device configuration, and actual sessions. Each stage needs a clear source of truth and a recovery method when the stages do not agree.
A plan describes the commercial offer; an entitlement describes the access a subscriber is currently allowed to receive. Record the rules for activation, renewal, expiry, suspension, and an authorized override. Identify whether a renewal extends an existing entitlement or creates a new period with different policy.
These rules determine what the billing application must persist and what it asks the network to apply. Ambiguity here becomes operational confusion later: a payment can be valid while the intended duration, speed profile, or subscriber account remains uncertain.
A payment event needs to be correlated with an expected transaction and subscriber context. Define the amount, account reference, provider identifiers, and final status that must be checked before entitlement changes. The approved provider integration and its supported verification methods determine the implementation details.
Callbacks may arrive more than once or after the initial request has timed out. The billing record should preserve a stable transaction identity and make repeated delivery harmless. A browser notification or an uncorrelated callback should not independently establish that access must be granted.
Provisioning is a separate operation from payment confirmation. A gateway can be unreachable or a management request can time out after the device has applied a change. Repeating commands without examining state can make the subscriber record harder to reconcile.
Record the intended access policy and the result of each provisioning attempt. Define when the system should read actual state, retry with a bounded policy, or ask an operator to review the exception. Support teams need to distinguish paid, pending provisioning, active, and failed states.
The network management interface, the operator console, and the public subscriber portal have different access requirements. Agree the minimum management permissions, network reachability, credential handling, and change approval needed for the work. Credentials should not become part of public application code or routine diagnostic output.
For fiber provisioning, review the actual OLT models, software versions, topology, and operator procedures. Configuration work also needs a record of the starting state, an agreed change window where applicable, and a practical recovery or rollback method.
An operator should be able to connect a subscriber’s entitlement to its authorizing payment and last known network state. The interface should expose the unresolved step rather than collapse the whole process into a single green or red indicator. An authorized manual action should retain its reason and context.
The handover should explain supported devices and flows, required configuration, diagnostic events, recovery steps, and responsibility for provider accounts. Future plan changes, network upgrades, and support coverage should be scoped deliberately rather than assumed to be included forever.
| Stage | Record or observation | If it cannot complete |
|---|---|---|
| Initiate payment | Expected subscriber, amount, and provider request identity. | Show a meaningful initiation failure without granting access. |
| Confirm payment | Verified transaction correlated to the intended renewal. | Keep the request pending or rejected according to verified status. |
| Apply entitlement | Durable access intent and a traceable provisioning attempt. | Preserve payment confirmation and schedule or surface recovery. |
| Verify access state | The relevant device policy or session evidence. | Reconcile intended and actual state before another change. |
Bring us your hardest software or infrastructure challenge.
Let’s find a clear path forward.